Cost of Internal rejection

Use this option to generate a report on the parts rejected during internal quality testing. Specify the required period by entering Period From and Period To. Select the required parts from the Available Parts list using the selection/de-selection buttons.

This report can be seen only after closing the Job and if the Disposal Action has been taken.

Click OK to confirm the selection and proceed with the generation of report. This report provides details about the Cost of raw material, Cost of repair, Cost of processing and the Disposal action for a closed job. Click Cancel to exit.