Work Order & Job Creation is included in the product installed, it allows defining work order & job
Click on Add button to create a work order and Job. You may select the Part Number for which the work order is being created from the Part drop down list box. Select Process from the Process drop down list box and Work Order is displayed i.e. PartNo_SystemDate. Enter the quantity of the parts to be manufactured in the Target Quantity text box. If the job is created for multiple fixtures then either of the options, ‘By Piece’ or ‘By Fixture’ option can be selected. You may click on the Save button to save work order and job. If job already exist for the WorkorderNo, part, process and machine then it will display, message stating that Job already exists, and if you still want to create another work order with the same date then it would be created and displayed as follows: - PartNo_systemdate_1.
If selected Part and Process are not mapped to fixture(s). Then created job will be available in Local Monitoring. If selected Part and Process are mapped to Fixture then created Job will be available for monitoring in Fixture Monitoring and Local Monitoring screens. If mapping is done with more than one fixture then all mapped fixtures are shown in Fixture Details grid and Measurement group box is enabled. You may select Measurement type and change the Sequence No. Of Fixture.
Measurement type can be
By Fixture
By Piece
By Fixture – means you are allowed to take one set of reading form current fixture. Then automatically next fixture in sequence will be available for capturing readings.
By Piece – means that you can take as many readings as you want on one fixture continuously. When you want to move to the next fixture in sequence for data capturing you have to select option for it on measurement screen.