Production had done for a Model on a Machine No. for a particular Shift Date and Shift Code is specified in this screen. Click on the Add button to enter the production. Select the Shift Date, Shift Code, Model Code, Machine No., and Supervisor Code and enter the Shift Production. On click of the Add button, by default the current Shift Code is displayed. If model has been defined for the local machine, then that model and machine shall be displayed in the Model Code and Machine No. Drop down list box. You cannot enter production for shift dates greater than the current date. Click on Save button to save the record. After saving the record, if the quantity produced by the tool is nearing or has exceeded its Expected Tool Life then corresponding screens shall be launched, which shall display the expected quantity and the produced quantity.
You can modify the Shift Production only for the current Shift Date. Back dated production quantity cannot be modified.
You can delete the record only for the current shift date. Back dated record cannot be deleted. Click on the Delete button to delete the record.
Model Close facility is also provided from this screen. If the production for one model has been completed and you want to start with another model, then the previous model can be closed by clicking on the Model Close button. Select the model that is to be closed, and then click on the Model Close button, which shall launch a screen for selecting the new model. While closing model, the model shall be closed only for the machine that was selected for Model closure.